Atucha II Nuclear Power Plant

Atucha II Nuclear Power Plant

Frederic P. Miller, Agnes F. Vandome, John McBrewster

     

бумажная книга



Издательство: Книга по требованию
Дата выхода: июль 2011
ISBN: 978-6-1325-8506-6
Объём: 68 страниц
Масса: 123 г
Размеры(В x Ш x Т), см: 23 x 16 x 1

High Quality Content by WIKIPEDIA articles! pressure vessel of any nuclear power plant worldwide. The total cost is now (2006) estimated at US$3.8 billion, or about $5500/kWe, considerably higher than the worldwide mean of about $1500/kWe. Partly as a response to the energy shortage caused by natural gas crisis of 2004, the issue of Atucha II was taken up by the Argentine government. In 2005 President Nestor Kirchner signed a decree to reactivate the construction and pledged to finish it by 2009[4]. New technicians were hired and a budget of about $120 million was requested for 2006. Eduardo Messi, president of Nucleoelectrica Argentina S.A. (the firm in charge of the plant), told reporters that 93% of the components were either in storage or already installed.

Данное издание не является оригинальным. Книга печатается по технологии принт-он-деманд после получения заказа.

Каталог