Издательство: | Книга по требованию |
Дата выхода: | июль 2011 |
ISBN: | 978-6-1329-3475-8 |
Объём: | 140 страниц |
Масса: | 233 г |
Размеры(В x Ш x Т), см: | 23 x 16 x 1 |
High Quality Content by WIKIPEDIA articles! The total length of Qingzang railway is 1956 km (1215 mi). Construction of the 815 km (506 mi) section between Xining and Golmud was completed by 1984. The 1142 km (709 mi) section between Golmud and Lhasa was inaugurated on 1 July 2006 by president Hu Jintao: the first two passenger trains were "Qing 1" (Q1) from Golmud to Lhasa, and "Zang 2" (J2) from Lhasa. This railway is the first to connect the Tibet Autonomous Region to any other province, which, due to its altitude and terrain, is the last province-level entity in mainland China to have a conventional railway. Testing of the line and equipment started on 1 May 2006. Passenger trains run from Beijing, Chengdu, Chongqing, Guangzhou, Shanghai, Xining and Lanzhou.
Данное издание не является оригинальным. Книга печатается по технологии принт-он-деманд после получения заказа.