Pampa Wind Project

Pampa Wind Project

Lambert M. Surhone, Mariam T. Tennoe, Susan F. Henssonow

     

бумажная книга



Издательство: Книга по требованию
Дата выхода: июль 2011
ISBN: 978-6-1324-3487-6
Объём: 88 страниц
Масса: 153 г
Размеры(В x Ш x Т), см: 23 x 16 x 1

High Quality Content by WIKIPEDIA articles! Mesa Power, a company controlled by former Texas oilman, T. Boone Pickens, planned to build the world's largest wind farm, called the Pampa Wind Project, as part of the Pickens Plan. The proposed 4,000 MW facility was to be located near Pampa, Texas, which is on the Texas Panhandle, and stretch to the east, spanning 400,000-acre (1,600 km2) in five counties. This would provide enough power for 1.5 million average homes. Mesa Power placed an order for the first shipment of 667 wind turbines from General Electric — the world's largest wind turbine order for a single location — and this will provide 1,000 MW of wind power capacity for the $2 billion first phase of the project, which should be online by 2011. Lease payments for the land used by the turbines were expected to cost $65 million a year. The total cost of the project was estimated at $8–10 billion.

Данное издание не является оригинальным. Книга печатается по технологии принт-он-деманд после получения заказа.

Каталог