Please note that the content of this book primarily consists of articles available from Wikipedia or other free sources online. Two units at the Taishan Nuclear Power Plant are under construction in Chixizhen, Taishan, Shandong province, China. It is planned to go online in 2013 and will be the third site to house Areva's 1,700 megawatt (MW) European Pressurized Reactor (EPR) units. The project is owned by Guangdong Taishan Nuclear Power Joint Venture Company Limited (TNPC), a joint venture, which is 70% owned by China Guangdong Nuclear Power Group (CGNPC) and 30% by Electricite de France (EDF).