Издательство: | Книга по требованию |
Дата выхода: | июль 2011 |
ISBN: | 978-6-1323-1627-1 |
Объём: | 112 страниц |
Масса: | 190 г |
Размеры(В x Ш x Т), см: | 23 x 16 x 1 |
High Quality Content by WIKIPEDIA articles! The contract to build Pargo was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 26 March 1963 and her keel was laid down there on 3 June 1964. She was launched on 17 September 1966, sponsored by Mrs. James L. Holloway, Jr., the wife retired Admiral James L. Holloway, Jr. (1898–1984), and commissioned on 5 January 1968 with Commander Steven A. White in command.
Данное издание не является оригинальным. Книга печатается по технологии принт-он-деманд после получения заказа.